Serra de l'Ebre
Needs attentionCatalonia · Wind · 57 MW installed · 5 technicians · manager Firas Cheaib
16.6 MW
29 %
261 MWh
96.6 %
9 / 13
6
Wind
9.9 m/s WSW
Irradiance
28 W/m²
Temperature
15.4 °C
Cloud cover
26 %
Conditions
Sunny intervals
Substation
Ascó SE 400 kV
Voltage
398.4 kV
Frequency
49.970 Hz
Power factor
0.979
Curtailment
8 %
Day-ahead price
73.73 €/MWh
Assets
13 assets on site. Open one for its live 3D view.
Wind turbine
WTG-03
Siemens Gamesa SG 5.0-145 · 6.2 MW
Output
5.23 MW
Today
34.7 MWh
Wind
11.4 m/s
Wind turbine
WTG-04
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
0.26 MW
Today
27.5 MWh
Wind
5.9 m/s
Wind turbine
WTG-05
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
0.00 MW
Today
12.3 MWh
Wind
10.6 m/s
Wind turbine
WTG-07
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
0.00 MW
Today
31.2 MWh
Wind
9.5 m/s
Wind turbine
WTG-08
Nordex N149/4.0-4.5 · 5.0 MW
Output
4.59 MW
Today
24.5 MWh
Wind
11.8 m/s
Wind turbine
WTG-09
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
1.35 MW
Today
14.1 MWh
Wind
9.9 m/s
Wind turbine
WTG-10
Siemens Gamesa SG 6.6-170 · 4.2 MW
Output
0.09 MW
Today
24.4 MWh
Wind
5.1 m/s
Inverter skid
INV-01
Sungrow SG3125HV-MV · 4.6 MVA
Output
3.66 MW
Today
23.2 MWh
Availability
99.5 %
Inverter skid
INV-02
SMA Sunny Central 4600 UP · 3.1 MVA
Output
2.32 MW
Today
16.0 MWh
Availability
96.3 %
Blade ice detected
Generator winding temperature high
Yaw misalignment above limit
Pitch system hydraulic pressure low
Cooling fan failure
Service interval exceeded